Day 17: Started working on the opening in the center of the ceiling. We put up plywood (that my dad painted to match the walls) to use as the base.
One side was flat while the other was angled upward to create depth.
Mike built a frame for the window, I stained it, then he installed it.
LED lights were stapled to the plywood, and then cargo nets were put up over them. Thus creating a "jungle canopy with stars shining through".
Foliage was stapled up to further create the "jungle canopy" look.
No comments:
Post a Comment