Sunday, March 25, 2018

March 25th, 2018


More work was done today, but of course:
  • Mike bought us (and installed) a new fancy lock for our front door!
  • Mitch showed up at 8AM to help Mike install the flooring for the downstairs bathroom/walkway, as well as our new Toto toilet!
  • Mitch and Mike also installed our new bedroom fan in the master bedroom (plus the faceplates, vents, etc).
  • Later in the afternoon, mom came over with Jax and they painted the downstairs bathroom.
  • I was feeling rather sick again, but I did manage to make a trip to the apartment to bring more of our stuff over.

No comments:

Post a Comment