So I've been doing a semi-good job of keeping ya'll updated on our progress, but I think I missed a few things here and there so I wanted to make one big post to clarify where we stand so far! :)
Here's what is done:
Here's what is done:
- All of the flooring is 100% cleaned and installed on both levels.
- The upstairs is 100% painted, aside from the multi-level wall that stretched from the first floor to the second floor (Tony and Ernesto are coming sometime soon to paint that for us!).
- The master bathroom is completely finished.
- The master bedroom closet is 100% done.
- The bedroom is nearing completion (there's just a lot of this and that scattered about right now in there).
- The bedroom's annex is almost done.
- The upstairs master bedroom is completely done, minus a shower curtain which I need to run out and buy.
- The art room is steadily making progress.
- The loft is 100% complete.
- The downstairs bathroom is finished.
On our to-do list we have:
- The kitchen remodel (repainting the cabinets, new granite, and installing the island).
- Painting the downstairs living room, kitchen, and dining room.
- Finishing the living room / finding a new couch (and possibly a new TV?).
- Finishing the dining room / finding a new table and chairs.
- Unpacking the remaining boxes (see photo).
No comments:
Post a Comment